Fire drill and evacuation training according to plan
การอบรมฝึกซ้อมดับเพลิงและอพยพหนีไฟตามแผนที่กำหนด
Requirement
Conduct fire drill and evacuation training according to defined plan
FY2569 Status · 5.5.1
FY2569 data not yet availableNo verified FY2569 data or evidence is available for this indicator yet
- Updated
- 2026-08-27
This FY2569 status reflects operational progress only — it is not an official Green Office assessment score
FY2568 Baseline
FY2568 baseline context
Emergency preparedness (5.5)FY2569 awaiting update- Fire drill
- Drilled 30 May 2568 · 104 attendees (FY2568 baseline)
- Emergency plans
- Emergency + suppression plans (FY2568 baseline)
- Fire equipment
- 26 extinguishers · 12 hose points (FY2568 baseline)
- FY2569 status
- Awaiting FY2569 collection (FY2568 baseline)
Limitations: The FY2568 drill result (104 attendees ≈78.35%) is frozen baseline; a new drill is required in FY2569. Approval/certificate scans pending OCR.
Original document for review
Original 5.5 FY2568 documents
Openly published FY2568 source files for group 5.5 — for original-document review (Phase-A-approved set only; the FY2569-budget contract (งบ 69) and the report PDF export excluded)
- PDF
5.5.1-1 ขออนุมัติจัดโครงการอพยพหนีภัยกรณีเกิดเพลิงไหม้และแผ่นดินไหวปี68.pdf
Open original documentDrill project approval, FY2568 (scan)
Building floor plan (Green Office), FY2568
Fire-exit signage
Evacuation flag bearers
Assembly point
Drill-day photos
Training certificate, FY2568 (scan)
Emergency plan
Fire prevention and suppression plan
Hose-cabinet report floor 1
Hose-cabinet report floor 2
Hose-cabinet report floor 3 (the -3 file is absent — EXPECTED_SOURCE_UNCONFIRMED)
Fire-equipment adequacy and readiness
Extinguisher inspection log floor 1, FY2568 (scan)
Extinguisher inspection report floor 1, FY2568
Extinguisher inspection log floor 2, FY2568 (scan)
Extinguisher inspection report floor 2, FY2568
Extinguisher inspection log floor 3, FY2568 (scan)
Extinguisher inspection report floor 3, FY2568
Section summary 5.5 Emergency preparedness
FY2568 Green Office annual report, Category 5 (DOCX — the only fully content-verified source; covers all 13 indicators)
FY2568 implementation notes from evidence
- Drill photo pack has a readable text layer; drill facts (planned Mar 2568, executed 30 May 2568 08.30-17.00; 97 building personnel, 104 attendees = 78.35% vs >=40% criterion; +28 external participants; flag bearers per floor; assembly point front of building, backup at ลานจัตุรัสนานาชาติ) cross-verified against the content-verified annual report DOCX. Approval scan and certificate scan pending OCR.
Issue
Emergency Preparedness
Code: 5.5
Related dashboards
No direct dashboard mapping
Linked Evidence (1)
FY2568 Baseline Reference (1)
FY2568 baseline documents for comparison only — not FY2569 results
- Cat5 FY2568 Fire Drill 5.5.1
Cat5 FY2568 Fire Drill 5.5.1
2568PDFReviewedPublic document