Environment and Safety
Control air quality, lighting, noise, livability and emergency preparedness in the office
FY2569 (current year) vs FY2568 (reference baseline)
The left column shows FY2569 (assessment year) status; the right column is the FY2568 baseline for historical comparison only.
FY2569 Assessment Year
Current YearStatus: Awaiting update
No FY2569 assessment data is available for this category yet. This release adds no FY2569 counts, evidence, results, or indicator mappings.
FY2568 Year Base (Baseline)
ReferenceFY2568 Year Base (Baseline)
Category-level baseline recorded: 47 records
Source document types: PDF 46 · DOCX 1
FY2568 is a frozen public baseline. Source documents are publicly available from this site at the category document center .
Category-level baseline only; no verified indicator mapping.
Source-structure note: all 13 indicators have dedicated FY2568 evidence (47/47 files SHA-256 matched), but it is the baseline layer for FY2569 — light measurement, the fire drill and recurring inspections must be re-collected in FY2569. 23 files are scans (content unverified), 5.3.1 has no sound measurement (pending assessor confirmation), the 5.4.2/5.4.3/5.5.2 percentages are not evidenced, the FY2569-budget contract is excluded, and file 5.5.3-3 is unconfirmed.
Category 5 environment & safety cycle
FY2568 facts below come from the normalized Category 5 contracts and are the frozen baseline for FY2569. Each stage links to its indicators. Recurring evidence (measurements, drills, inspections) is awaiting FY2569 collection — never presented as a new result.
- 1 Indoor air
Maintain AC/printers, run no-smoking campaign, manage renovation pollution
- 2 Lighting
Measure light intensity annually with certified equipment and correct per standards
- 3 Noise
Define internal-noise and renovation-noise countermeasures
- 4 Livability
Care for areas and green space, cleanliness, and disease-vector control
- 5 Emergency readiness
Run the annual fire drill, keep plans current, inspect fire equipment
FY2568 domain snapshot
Verified FY2568 baseline facts from the normalized Category 5 contracts — the frozen baseline layer for FY2569. Shown as coverage context, never as an official score or PASS claim. Percentages not evidenced in the sources are shown as unavailable; recurring evidence awaits FY2569 collection.
- AC maintenance
- 148 units · 2 rounds/year (FY2568 baseline)
- No-smoking campaign
- Signage + designated areas (FY2568 baseline)
- Construction air measures
- Measures on file (contextual)
- FY2569 status
- Awaiting FY2569 collection (FY2568 baseline)
- Light measurement
- Measured 7–8 Jul 2568 by qualified safety officer (FY2568 baseline)
- Criterion cadence
- Annual — must be re-measured in FY2569
- FY2569 status
- Awaiting FY2569 collection (FY2568 baseline)
- Internal noise measures
- Measures on file (FY2568 baseline)
- Sound-level measurement
- Not measured — pending assessor confirmation
- FY2569 status
- Awaiting FY2569 collection (FY2568 baseline)
- Assessed area
- 9,881 m² · green area 282 m² (FY2568 baseline)
- Space utilization
- Percentage not evidenced in FY2568 sources
- Area maintenance
- Percentage not evidenced in FY2568 sources
- Vector control
- Per-floor plans + daily inspections (FY2568 baseline)
- Fire drill
- Drilled 30 May 2568 · 104 attendees (FY2568 baseline)
- Emergency plans
- Emergency + suppression plans (FY2568 baseline)
- Fire equipment
- 26 extinguishers · 12 hose points (FY2568 baseline)
- FY2569 status
- Awaiting FY2569 collection (FY2568 baseline)
Issues and Indicators
Indoor Air Quality
- 5.1.1 Indoor air pollution control in the office
Control and manage indoor air pollution appropriately
- 5.1.2 No-smoking campaign or designated smoking areas with compliance
Promote no-smoking or designate appropriate smoking areas and ensure compliance
- 5.1.3 Management of air pollution from construction, renovation or other activities affecting personnel
Manage air pollution from construction or renovation affecting personnel
Office Lighting
Noise Management
Livability
- 5.4.1 Office livability management plan
Plan and manage office livability systematically
- 5.4.2 Percentage of space utilization meeting office-defined objectives
Office space utilization meets defined objectives
- 5.4.3 Percentage of area maintenance and upkeep
Regularly maintain and upkeep all office areas
- 5.4.4 Vector control implemented as specified
Control disease vectors according to specified measures
Emergency Preparedness
- 5.5.1 Fire drill and evacuation training according to plan
Conduct fire drill and evacuation training according to defined plan
- 5.5.2 Current and appropriate emergency plan with percentage of personnel understanding it
Maintain current emergency plan and ensure personnel understanding
- 5.5.3 Adequacy and readiness of fire protection equipment and alarm systems with personnel knowing usage and inspection
Fire equipment and alarm systems adequate, ready for use, and personnel know operation