Cat5 FY2568 Indoor Air Maintenance 5.1.1
ID: ev-cat5-air-maintenance-fy2568 Updated: 2026-08-24
Description
Maintenance plans/forms/photos for AC (148 units, 2 rounds/year), printers, carpet, bookshelves, lift and engine-off signage; execution cross-verified via the annual report.
Linked Categories
Linked Issues
- 5.1: Indoor Air Quality
Linked Indicators
Verification Status
Verification Basis: Maintenance plan/forms/photos for AC, printers, carpet/bookshelves, lift and vehicle-exhaust signage are image scans (content pending OCR). Execution facts (148 AC units, 2 rounds/year: round 1 Jan-Mar 2568 self-clean, round 2 May-Oct 2568 incl. contractor) are cross-verified against the content-verified annual report DOCX.
Provenance
Cat5 FY2568 Indoor Air Maintenance 5.1.1
Mapping confidence: high · Human verification required
Source Document
5.1.1(1) แผนการบำรุงรักษาประจำปี 2568.pdf
Source file — PDF