Skip to main content

Maejo University

Indicator-linked Reviewed DOCX 2568 Available

Cat5 FY2568 Construction Air Measures 5.1.3

ID: ev-cat5-air-construction-fy2568 Updated: 2026-08-24

Description

Countermeasures narrative (backup workspaces, dust barriers, signage) from the annual report; execution conditional on renovation.

Linked Issues

  • 5.1: Indoor Air Quality

Verification Status

Reviewed

Verification Basis: Content-verified from the annual report DOCX section 5.1.3: defined countermeasures for construction/renovation air pollution (backup workspaces, dust barriers, warning signage). No standalone evidence file exists; execution is conditional on renovation activity occurring.

Provenance

Cat5 FY2568 Construction Air Measures 5.1.3

Mapping confidence: high · Human verification required