Indicator-linked Reviewed DOCX 2568
Available
Cat5 FY2568 Construction Air Measures 5.1.3
ID: ev-cat5-air-construction-fy2568 Updated: 2026-08-24
Description
Countermeasures narrative (backup workspaces, dust barriers, signage) from the annual report; execution conditional on renovation.
Linked Categories
Linked Issues
- 5.1: Indoor Air Quality
Linked Indicators
Verification Status
Reviewed
Verification Basis: Content-verified from the annual report DOCX section 5.1.3: defined countermeasures for construction/renovation air pollution (backup workspaces, dust barriers, warning signage). No standalone evidence file exists; execution is conditional on renovation activity occurring.
Provenance
Cat5 FY2568 Construction Air Measures 5.1.3
Mapping confidence: high · Human verification required
Source Document
รายงานกรีนหมวด 5 (68) อาคารสมเด็จพระเทพฯ.docx
Source file — DOCX