Skip to main content

Maejo University

Indicator-linked Pending review PDF 2025 Source file not available SharePoint link pending

Signed Green Office Environmental Policy 2025

ID: ev-about-policy-signed Updated: 2026-08-18

Description

Senior management signed environmental policy for Chalermprakiat Building.

Linked Issues

  • 1.1: Defining Green Office Operational Guidelines

Verification Status

Pending review

Verification Basis: ET-1 traceability promotion: signed policy PDF (doc/GreenOfficePolicy2026.pdf) is off-disk and not tracked in the repository (checked 2026-08-02); realSourceAvailable set false. Human data-owner verification and file restoration required before verified status. Phase B (2026-08-18): indicator remapped 1.2.1 → 1.1.2 per official 2569 taxonomy.

Source Document

Source file not available

The source workbook is not in the repository or static site bundle. Metadata above is for reference only.

Expected location: doc/GreenOfficePolicy2026.pdf

SharePoint link pending

An authenticated SharePoint access link will appear here once assigned by an administrator.

Linked from the platform canonical metadata

  • พ.ศ. 2569 2 pages Signed

    Green Office Policy 2026 — Chalermprakiat Building

    Signed environmental policy

  • พ.ศ. 2569 9 pages

    Green Office Committee Meeting Minutes — 9 February 2026

    Policy review evidence