GHG reduction action plan for the organization
จัดทำแผนการดำเนินงานขับเคลื่อนสู่การลดก๊าซเรือนกระจกของหน่วยงาน
Requirement
Develop an action plan to drive organizational GHG reduction
FY2569 Status · 1.6.1
FY2569 data not yet availableNo verified FY2569 data or evidence is available for this indicator yet
Not in the owner-approved set. Annual plan record alone does not constitute implementation/result/pass. Keep FY2569 unavailable.
- Updated
- 2026-08-31
This FY2569 status reflects operational progress only — it is not an official Green Office assessment score
FY2568 Baseline
Indicator 1.6.1 · FY2568 Historical Baseline
GHG reduction action plan
Summary from projects.json contract and 1.6.1 sources — not an official Green Office score
Plan readiness
ปี 2568 (การดำเนินงาน 1 ปี)
Supported vs partial elements
- Written plan Supported
FY2568 annual plan documented per 1.6.1 evidence
- Duration ≥ 1 year Supported
1-year scope (FY2568)
- Executive approval Supported
Stated in 1.6.1 and 1.1.4 sources (4 units)
- Plan activity schedule Not locally available
Not locally auditable — ERP attachment not stored in repo
- Link to 1.1.3 targets Supported
References FY2568 environmental targets announcement (FY2567 base)
- Carbon Neutrality / Net Zero Partial / weak
Criterion text in 1.6.1 §(4) — not separately evidenced beyond policy §8 GHG campaign
Policy & target linkage
- References FY2568 Green Office policy (signed 25 Mar 2568) §8 — continuous GHG reduction campaign
- Environmental targets 1.1.3 (FY2567 base)
Detailed activity schedule — not in repo
1.6.1 cites an ERP attachment (https://erp.mju.ac.th/openFile.aspx?id=NzY5NTQz) not stored in the repository — activity details are not invented here
Relationship to 1.5.2
- FY2568 GHG reduction target
- −1%
- FY2568 actual
- +4.82% (increase)
- Status
- Not met
FY2568 sources do not explicitly link these projects to closure of the +4.82% GHG performance gap — project success is not measured GHG reduction
1.6 projects vs the GHG gap
-
โครงการ Green Office และกิจกรรม 5 ส (Big Cleaning Day)
Supporting GHG actionObjective cites energy/GHG — no measured tCO₂e
-
โครงการลดปัญหาหนูในพื้นที่ทำงาน เพื่อสิ่งแวดล้อมปลอดภัยตามแนวทาง Green Office
Environmental improvementSanitation/IPM focus — no quantified GHG
Management review report (1.7.2)
MR#1 (7 Mar 2568) approved the FY2568 plan (monthly Big Cleaning, pest-trace inspection, lighting checks) but does not name 1.6 projects nor explicitly review the +4.81% GHG result — the projects cannot yet be shown to close the GHG gap
Sources
FY2568 sources do not explicitly link 1.6 projects to closing the +4.81% GHG gap in management review
FY2568 contract context
Projects & reduction (1.6)- Projects 2
- Reduction plans 1
- Source files
- 3
- Verification
- reviewed
- Contract status
- normalized-partial
Original document for review
Original 1.6 FY2568 documents
Openly published FY2568 source files for group 1.6 — for original-document review
Indicator 1.6.1 document — organizational GHG reduction action plan
Indicator 1.6.2 document — GHG reduction plan/projects
Annex to item 1.6 — action plan and projects
Annex to item 1.6 (PDF)
Form ย.002 — 5S project
Form ย.002 — rodent reduction project
FY2568 5S Green Office project report
- PDF
รายงานโครงการลดปัญหาหนูในพื้นที่ทำงาน เพื่อสิ่งแวดล้อมปลอดภัยตามแนวทาง Green Office.pdf
Open original documentRodent reduction project report — safe environment per Green Office approach
Issue
GHG Reduction Plans and Projects
Code: 1.6
Related dashboards
Evidence linked to this indicator
No indicator-level evidence is linked yet